Fort Dodge Riverfront Trail

Des Moines River

Fort Dodge, Iowa

Valuation

$3.1 million+

Client

Rock Island District of the U.S. Army Corps of Engineers

Timeline

September 2018 – October 2020

A HUGE UNDERTAKING

This project is one of the largest ones we have ever tackled. It required our team to clear land and install a multi-use trail along the eastern bank of the Des Moines River in the City of Fort Dodge, Iowa. The scope of work included:

  • Stripping
  • Clearing
  • Grubbing
  • Construction of a multi-use trail
  • Construction of safety fence
  • Design and construction of Mechanically Stabilized Earth (MSE) walls
  • Stone placement
  • Box culvert installation
  • Design and construction of a culvert headwall
  • Bituminous paving

The RBV Contracting team gave this project our all. It was our first project west of the Mississippi, so we were excited to break ground.

PROVIDING A PUBLIC SPACE

This project focused on the creation of a multi-purpose trail that locals could use to enjoy the beauty of the Des Moines River. We approached the project with care and a focus on safety at all times.

Check out the video below to see how the project progressed over time!